- Prepare Pipe Ends
- Close the carriage with the minimal force necessary to FACE the pipe ends.
- Continue facing until the jaws come into contact with both mechanical stops and have produced a minimum of one complete ribbon.
- CLEAN fusion area after facing.
- At FACING force, check ALIGNMENT of the pipe ends and check for GAPS.
- Inspect, Clean & Install Pipe